Shenzhen DJX participated in The East West Pipleline ResidentialCompounds Project for Saudi Aramco in SaudiArabia
Shenzhen DJX participated in The East West Pipleline ResidentialCompounds Project for Saudi Aramco in SaudiArabia
2023-08-18
Project Name: The East West Pipeline Residential Compounds Project
Location: Saudi Arabia
Investor: Saudi Aramco
Time: 2023.
Project Details:
The East West Pipeline Residential Compounds Project is a Saudi Aramco initiative to build six new residential compounds along the East-West pipeline in Saudi Arabia, designed to house approximately 1,700 employees. Developed under a 20-year Build-Own-Operate-Transfer (BOOT) framework, the project involved international companies like POWERCHINA and was completed in April 2024. The project emphasizes sustainability, with some compounds featuring solar power, and aims to enhance the quality of life for employees and their families.
Client: Saudi Aramco
Purpose: To create modern, high-quality residential communities for employees along the East-West pipeline
Scope: Development, engineering, construction, and long-term maintenance of six residential compounds
Capacity: Accommodates approximately 1,694 to 1,748 residents across the six compounds
Size: Covers a total area of 769,568 to 770,000 square meters
Timeline: Awarded in 2021 and completed in April 2024
Framework: Built on a 20-year Build-Own-Operate-Transfer (BOOT) basis
Shenzhen DJX cable as a 35-year manufacturer of wire&cable, participated in this projects from August, 2023, and supplied YJV,YJV32, BV, ZR-KVVP22, NH-KVVP22 etc wires and cables.